Risk Engineering

Shutdown and Start-up Risks

Expert-reviewed Updated: 2026-09-01 Expert-reviewed: 2026-09-04 (Guido Hesse, Hesse Group Holding AG) Version 0.1.0

Shutdown and start-up risks arise when an operation or parts of a plant are temporarily taken out of service or brought back online, since supervision, protection systems and established routines are reduced during these phases.

Why shutdown and start-up are critical

During plant holidays, seasonal downtime or the abandonment of parts of an operation, production-specific risks disappear, but new hazards emerge: early fire detection by staff cannot be expected, since nobody is continuously present, while arson, theft and vandalism find additional targets. Restarting process plant sees a disproportionate share of incidents, because equipment conditions deviate from normal-operation baselines and staff perform unfamiliar tasks under time pressure.

Protective measures

Before a shutdown, ignition sources and combustible loading should be minimised, all protection systems confirmed operational, and the insurer notified of the planned measure so the risk assessment can be reviewed. The shut-down site should be patrolled and inspected regularly. Before restart, a pre-startup safety review confirms that equipment condition, protection systems and documentation match the approved target state before the process resumes.

Relevance for insurance

Property insurers require early notification and adapted safety measures for planned extended shutdowns, since unguarded, shut-down premises and uncontrolled restarts disproportionately lead to major losses.

Standards and codes

  • VdS 2000-S1 – Shutdown of Operations (Topic-specific Supplement to the Guide on Fire Protection in the Workplace – VdS 2000)