Risk Engineering

Crane and Lifting Equipment Risk

Expert-reviewed Updated: 2026-09-01 Expert-reviewed: 2026-09-04 (Guido Hesse, Hesse Group Holding AG) Version 0.1.0

Cranes and lifting equipment carry the risk of a dropped load through overload, failure of load-bearing components or human error, endangering the lifted goods as well as neighbouring plant and personnel.

Hazard picture

A dropped load is the most severe single risk in crane operations: it results from exceeding the permissible working load, failure of ropes, chains or slings through wear or damage, fracture of load-bearing structural components, and operating errors such as swinging loads or unsuitable attachment points. Beyond the lifted load itself, equipment, stored goods or personnel underneath are frequently affected, so crane incidents regularly cause consequential damage that considerably exceeds the immediate property loss.

Protective measures

Key measures are code-compliant design and load-rating markings, recurring inspection of the structure, ropes, chains and safety devices such as overload and limit switch cutoffs, and documented training of operating personnel including the rules for rigging loads. Visual checks before each shift and a structured discard criteria assessment for ropes and slings complement the periodic thorough inspections.

Insurance relevance

For machinery and property insurance, both the condition of the load-bearing structure and compliance with inspection and maintenance requirements are decisive for crane risks. Missing or overdue thorough inspections, unclear responsibility for sling inspection, or a history of near-miss incidents are treated as significant risk factors when underwriting the relevant cover.